Nirvana

Under construction
Offices
Shops
Under construction
Offices
Shops

Nirvana

Developer/Investor: Générale Continentale Investissements (GCI)
Architect: Studios Architecture
Height: 9 stories
Area: 20,000 m²
Program: 20,000 m² of office space, 2,000 m² of rooftop gardens, and two retail units on the ground floor
Completion: 2027
Location: Arche Nord, Coupole-Regnault neighborhood (Courbevoie)

The Nirvana Project consists of the major restructuring and extension of the existing building known as Being, located between Rue Ségoffin and Rue du Capitaine Guynemer in Courbevoie.

Program overview

This project includes:

  • Approximately 20,000 square meters of office space and two retail units on the ground floor;
  • A parking garage with 157 parking spaces, including 4 spaces for people with disabilities, as well as bicycle parking on four basement levels. 

In addition, the Nirvana project includes:

  • The restructuring and extension of the existing non-high-rise building, changing its classification from a Labor Code building to a non-high-rise Labor Code building and a third-category public building.
  • The redevelopment and enhancement of the base in connection with the public domain and the creation of an active base. The redefinition of boundaries will also be a lever for opening up the building to the city.
  • The reorganization of access points (pedestrians, bicycles, parking, delivery area) and in particular the creation of identifiable entrances on the street via new forecourts.
  • The proposal for a contemporary design for the facades that fits in with their environment.
  • The reorganization of functional connections within the building and the improvement of the building's operation.
  • The creation of a restaurant and co-working space, a green walkway on the top two floors and on the roof, as well as the improvement of spaces, services, flexibility, and technical and environmental performance.

Ambitious certifications

Target Certifications: BREEAM NC, BBCA Renovation and New Construction, HQE Sustainable Building, OsmoZ Levier Bâti, WiredScore-SmartScore

Key project dates

Start of construction: 2025
Completion: 2027