Construction site infos

Preparatory work on Pesaro Boulevard in the Croissant area

D'avril à juillet 2026

Paris La Défense is carrying out preparatory work for future improvements in the Croissant area between April and October 2026.
This work includes:

  • Relocating existing utility lines
  • Modifying and improving the safety of pedestrian walkways
  • Renovating road infrastructure

This work will require the closure of Boulevard Pesaro between the Fraternité parking lot and the Pont des Coudraies from April 1 to June 30, 2026. A detour will be in place via Boulevard Aimé Césaire.

If you have any questions, please contact: vu@parisladefense.com

Zone noir, immeuble Fraternité